Mission Update
2009 Archive
December 18, 2009
Arianespace delivers Helios 2B into Sun-synchronous polar orbit on Ariane 5's
seventh flight of 2009
December 18, 2009
Final countdown resumes for Ariane 5’s mission with Helios 2B
December 17, 2009
A countdown “hold” results in the scrub of today’s Ariane 5 mission
December 16, 2009
Ariane 5 returns to the launch zone with its Helios 2B satellite payload
December 14, 2009
Arianespace's year-end mission with Helios 2B is set for December 17
December 9, 2009
Ariane 5's launch with Helios 2B is postponed
December 8, 2009
Ready for liftoff: Ariane 5 is in the launch zone with its Helios 2B military satellite payload
December 7, 2009
The year-ending mission with Ariane 5 and the Helios 2B military observation platform is given its “go” for launch
December 2, 2009
Ariane 5 is readied for its launch of the Helios 2B reconnaissance satellite
November 16, 2009
The seventh Ariane 5 of 2009 is delivered to Arianespace
October 29, 2009
Ariane 5 delivers the NSS-12 and THOR 6 television broadcast satellites on Arianespace’s sixth mission of 2009
October 28, 2009
Basic assembly is completed for the seventh Ariane 5 to be launched in 2009
October 28, 2009
Ariane 5 rolls out for Arianespace's sixth launch of 2009
October 27, 2009
Launch readiness review clears Ariane 5 for Arianespace’s October 29 liftoff
October 22, 2009
Payload integration is completed with NSS-12 and THOR 6 for Ariane 5’s next mission
October 20, 2009
Payload installation is underway for Arianespace’s sixth Ariane 5 mission of 2009
October 15, 2009
Integration begins for the seventh Ariane 5 to be launched in 2009
October 12, 2009
Arianespace takes delivery of the sixth Ariane 5 for launch in 2009
October 1, 2009
Another Arianespace launch success and a new commercial record for Ariane 5
September 30, 2009
Ariane 5 is poised for launch with a mixed civilian/military telecom satellite payload
September 30, 2009
The NSS-12 and THOR 6 payloads arrive at the Spaceport for Ariane 5's sixth launch of 2009
September 29, 2009
Arianespace's Ariane 5 mission is cleared for launch with Amazonas 2 and COMSATBw-1
September 28, 2009
Ariane 5's launch with Amazonas 2 and COMSATBw-1 is set for October 1
September 25, 2009
Final assembly of the fifth Ariane 5 for 2009 is complete with its dual-passenger payload
September 23, 2009
Maintaining Arianespace's mission pace: the seventh Ariane 5 for launch in 2009 arrives at the Spaceport
September 21, 2009
The Amazonas 2 satellite is integrated for Ariane 5's upcoming launch
September 17, 2009
Launch campaigns for Arianespace’s two upcoming Ariane 5 flights reach new milestones
September 15, 2009
Pre-launch processing begins with the COMSATBw-1 military communications satellite for Ariane 5's next launch
September 9, 2009
Assembly begins for the sixth Ariane 5 to be launched by Arianespace in 2009
September 4, 2009
Germany’s COMSATBw-1 military communications satellite is readied for its launch on Ariane 5
September 2, 2009
Pre-launch processing of Amazonas 2 is underway for Arianespace's next Ariane 5 mission
September 1, 2009
The fifth Ariane 5 for launch in 2009 is received by Arianespace
August 28, 2009
Amazonas 2 is delivered to the Spaceport for Arianespace’s fifth launch of 2009
August 21, 2009
> Ariane 5's fourth launch of 2009 orbits the JCSAT-12 and Optus D3 payloads for two Arianespace Asian-Pacific customers
> The Ariane 5 mission success with JCSAT-12 and Optus D3 in photos
> Final countdown underway for Ariane 5's mission with JCSAT-12 and Optus D3
August 21, 2009
The Ariane 5 for Arianespace's sixth flight of 2009 is ready for assembly
August 20, 2009
Three Ariane 5s are in the workflow as Arianespace sustains its launch rate in 2009
August 19, 2009
The go-ahead is given for Arianespace's heavy-lift launch on Friday with JCSAT-12 and Optus D3
August 17, 2009
Ariane 5 is ready for this week's heavy-lift launch with JCSAT-12 and Optus D3
August 13, 2009
Optus D3 is integrated on Ariane 5 for Arianespace’s dual-passenger mission at the service of Asia-Pacific telecom operators
August 12, 2009
Preparations continue with the JCSAT-12 and Optus D3 payloads for Ariane 5's next launch
August 11, 2009
Payload integration begins for Arianespace's Ariane 5 launch on August 21
August 7, 2009
Fueling of JCSAT-12 is performed for Arianespace’s fourth Ariane 5 mission of 2009
August 6, 2009
Optus D3 is fueled for Arianespace's upcoming dual-passenger Ariane 5 launch
August 3, 2009
Initial assembly is completed for the fifth Ariane 5 to be launched in 2009
July 24, 2009
Build-up begins for the fifth Ariane 5 to be launched in 2009
July 23, 2009
Pre-launch preparations are underway with Optus D3 for Ariane 5's next mission
July 21, 2009
Optus D3 is delivered to French Guiana for Arianespace's next Ariane 5 launch
July 20, 2009
Launcher and payload preparations advance for Arianespace’s mid-August liftoff with Ariane 5
July 6, 2009
Another Ariane 5 is readied for delivery to Arianespace at the Spaceport
July 1, 2009
> Ariane 5 soars to another heavy-lift success in lofting the TerreStar-1 mobile communications satellite
> Photo report: Ariane 5's record-setting mission with TerreStar-1
> A very special “thank you” for Arianespace Chairman & CEO Jean-Yves Le Gall from TerreStar Networks
June 30, 2009
Ariane 5 moves to the launch pad with TerreStar-1 for Arianespace’s third launch of 2009
June 29, 2009
Ariane 5 is given the “go” for its heavy-lift mission with TerreStar-1
June 26, 2009
Integration of Ariane 5 is completed for its upcoming heavy-lift launch with TerreStar-1
June 23, 2009
Ariane 5 receives its TerreStar-1 payload
June 22, 2009
> Initial build-up of the fourth Ariane 5 for 2009 is complete
> TerreStar-1 is mated with Ariane 5 hardware in preparation for its July 1 Arianespace launch
June 19, 2009
TerreStar-1 is fueled for Arianespace's upcoming heavy-lift Ariane 5 flight
June 12, 2009
Arianespace's fourth Ariane 5 of 2009 begins its assembly at the Spaceport
June 3, 2009
Arianespace receives the Ariane 5 for its TerreStar-1 mission
May 19, 2009
TerreStar-1 enters the pre-flight checkout phase for Arianespace’s next Ariane 5 launch
May 18, 2009
TerreStar-1 is welcomed to French Guiana for its June launch on Ariane 5
May 14, 2009
> Arianespace launches two spacecraft on missions to explore the universe
> Ariane 5's mission to deep space: The launch success in photos
May 13, 2009
Ariane 5 rolls out to the launch zone for its mission to deep space
May 12, 2009
Ariane 5's dual-payload space science mission is cleared for launch
May 11, 2009
Integration of Ariane 5 is completed for this week’s dual-passenger mission to explore the mysteries of space
May 4, 2009
Europe's Herschel space telescope joins its Planck observatory co-passenger on the Ariane 5 launcher
April 29, 2009
Final integration underway for Ariane 5's May 14 launch with Planck and Herschel
April 24, 2009
The Planck space observatory is integrated on Ariane 5 for Arianespace's upcoming launch
April 22, 2009
Herschel’s high-tech cooling system is loaded with helium for the telescope’s upcoming Ariane 5 launch
April 16, 2009
Herschel and Planck are readied for their integration with Ariane 5
April 10, 2009
The MN Toucan transport ship brings a new Ariane 5 to French Guiana
April 9, 2009
The Herschel space telescope is fueled for its May 6 launch on Ariane 5
April 8, 2009
Ariane 5's liftoff with the Herschel and Planck space science payloads is set for May 6
April 2, 2009
Launch date for Ariane 5’s space science mission with the Herschel and Planck payloads is under review
March 17, 2009A new Ariane 5 takes shape to launch the world’s largest commercial telecommunications satellite
March 13, 2009Arianespace postpones its next Ariane 5 launch at the customer's request
March 10, 2009Ariane 5 is ready for the integration of its dual space science payload
March 5, 2009The third Ariane 5 for launch in 2009 is delivered to French Guiana
March 2, 2009
The Planck spacecraft continues its integration and checkout for Arianespace's upcoming Ariane 5 mission
February 20, 2009Planck joins Herschel at the Spaceport for Ariane 5's dual mission to explore the universe
February 18, 2009Pre-launch inspections underway with the Herschel telescope payload for Ariane 5’s next launch
February 16, 2009The Herschel telescope is readied for Arianespace’s upcoming Ariane 5 flight
February 12, 2009
> Ariane 5 begins 2009 with another successful launch at Arianespace's service
> A “photo album” of Ariane 5’s successful launch with the HOT BIRD™ 10, NSS-9 and Spirale payloads
> The first Ariane 5 flight of 2009 enters its final countdown
February 12, 2009Assembly of the second Ariane 5 for 2009 marks a new milestone
February 11, 2009The Ariane 5 for Arianespace's first mission of 2009 is transferred to the launch zone
February 10, 2009Ariane 5 is cleared for its first mission of 2009
February 10, 2009Two Spirale satellites are ready for their liftoff as auxiliary passengers on Ariane 5's next mission
February 9, 2009Assembly begins at Europe’s Spaceport for the second Ariane 5 to be launched this year
February 4, 2009Ariane 5 is ready for launch with its payload of the HOT BIRD™ 10, NSS-9 and Spirale satellites
February 3, 2009
HOT BIRD™ 10 and NSS-9 mark new milestones in their integration for Ariane 5's initial mission of 2009
January 30, 2009The multi-passenger payload “stack” for Ariane 5's upcoming mission begins to take shape
January 29, 2009
A new Ariane 5 arrives in French Guiana for its dual-satellite mission to explore mysteries of the universe
January 28, 2009Arianespace begins final payload integration for its year-opening Ariane 5 mission
January 27, 2009Arianespace takes delivery of the Ariane 5 for its first launch of 2009
January 19, 2009Ariane 5's two primary payloads are readied for their February 12 liftoff from French Guiana
January 12, 2009HOT BIRD™ 10 begins its checkout for launch on Ariane 5's first mission of the New Year
January 8, 2009HOT BIRD™ 10 is delivered for its February liftoff on a multi-payload Ariane 5 mission
