Mission Update
2007 Archive
December 21, 2007
> Arianespace wraps up 2007 with its sixth dual-satellite Ariane 5 success of the year
> The successful Ariane 5 GS mission in photos
> Ariane 5 and its Automated Transfer Vehicle payload are readied for a historic launch in 2008
December 20, 2007 Arianespace’s sixth Ariane 5 of 2007 moves to the launch zone
December 19, 2007 Arianespace Flight RASCOM-QAF1 - HORIZONS 2: Launch postponed for 24 hours
December 18, 2007 The sixth Ariane 5 mission of 2007 is given the “go” for its December 20 launch
December 14, 2007 Soyuz orbits RADARSAT-2 for Canada on Starsem’s 20th mission success
December 12, 2007 Europe’s Automated Transfer Vehicle is readied for its Ariane 5 launch to support the International Space Station
December 11, 2007 The Ariane 5 for a record sixth mission of 2007 is now complete
December 10, 2007 Final payload integration begins for Ariane 5's record sixth launch of 2007
December 6, 2007 Payload on track for Ariane 5’s record sixth launch of 2007
December 3, 2007 Payload preparations enter the final phase for Ariane 5's record sixth launch of 2007
November 30, 2007 Arianespace's sixth Ariane 5 of 2007 is ready for its dual-satellite payload
November 27, 2007 Horizons-2 arrives at the Spaceport for pre-launch preparations
November 19, 2007 Pre-launch checkout underway with RASCOM-QAF1
November 14, 2007
> Arianespace marks another Ariane 5 payload record performance with Skynet 5B and Star One C1
> The record heavy-lift Ariane flight in photos
> Arianespace launch with Skynet 5B – Star One C1: The liftoff is set for Wednesday, November 14
November 12, 2007
> Arianespace Flight Skynet 5B – Star One C1: Launch postponed
> Arianespace's fifth Ariane 5 mission of 2007 is set for liftoff tonight
November 11, 2007 The Ariane 5 launch with Skynet 5B - Star One C1 is set for Monday, November 12
November 9, 2007 Arianespace's Ariane 5 mission is postponed
November 8, 2007 Ariane 5 rolls out for Arianespace's fifth launch of 2007
November 7, 2007 The fifth Ariane 5 mission of 2007 is cleared for liftoff
November 5, 2007 RASCOM-QAF1 is delivered for the year's sixth Ariane 5 mission
November 2, 2007 Payload integration is completed for Arianespace's fifth Ariane 5 flight of 2007
October 30, 2007 A heavyweight payload is readied for Arianespace’s fifth Ariane 5 mission of 2007
October 30, 2007 The sixth Ariane 5 launcher for 2007 takes shape at the Spaceport
October 26, 2007 Skynet 5B and Star One C1 are readied for Arianespace’s upcoming Ariane 5 mission
October 24, 2007 A milestone delivery: the Ariane 5 arrives in French Guiana for Arianespace's sixth mission of 2007
October 23, 2007 Arianespace takes delivery of its fifth Ariane 5 in 2007
October 21, 2007 Starsem orbits four more satellites to augment the Globalstar constellation
October 9, 2007 Star One C1 arrives in French Guiana for the fifth Ariane 5 mission of 2007
October 5, 2007 Ariane 5 soars to success with Intelsat 11 and Optus D2
October 4, 2007 Arianespace is ready for its fourth Ariane 5 mission of 2007
October 3, 2007 Ariane 5's liftoff with Intelsat 11 and Optus D2 is confirmed for October 5
September 25, 2007 Arianespace Flight INTELSAT 11 – OPTUS D2: Launch postponed by a few days
September 20, 2007
Ariane 5's assembly is completed with the integration of Optus D2 and Intelsat 11 on the
launch vehicle
September 18, 2007 Ariane 5’s upper payload “stack” is assembled at the Spaceport
September 17, 2007 Optus D2 is ready for integration on the Ariane 5 GS launch vehicle
September 14, 2007 The Ariane 5 for Arianespace’s fifth mission of 2007 takes shape at Europe’s Spaceport
September 10, 2007 Intelsat 11 is fueled at Europe's Spaceport for Arianespace's late September Ariane 5 mission
September 7, 2007 Ariane 5 is ready for the integration of its Intelsat 11 and Optus D2 payloads
September 4, 2007 The fifth Ariane 5 launcher of 2007 arrives in French Guiana
August 30, 2007 Two “sister” payloads for Ariane 5’s next mission are now at the Spaceport
August 14, 2007
> Ariane 5 delivers a heavy-lift U.S./Japanese payload on its 33rd mission
> The successful Ariane 5 mission in photos
> Ariane 5 mission with SPACEWAY™ 3 and BSAT-3a: Final countdown underway
August 13, 2007 Arianespace's Ariane 5 rolls out to the launch pad with SPACEWAY™3 and BSAT-3a
August 11, 2007 Ariane 5 is given the "go" for Tuesday's heavy lift mission with SPACEWAY™ 3 and BSAT-3a
August 7, 2007 Ariane 5 is complete with its SPACEWAY™ 3 and BSAT-3a payloads
August 6, 2007 Japan's BSAT-3a is installed on its Ariane 5 launch vehicle
August 2, 2007 SPACEWAY™3 is ready for launch on Ariane 5
July 30, 2007 Fueling is completed for Ariane 5’s dual satellite payload
July 27, 2007 A double transfer at the Spaceport for the next two Ariane 5 launchers
July 17, 2007 BSAT-3a and SPACEWAY™ 3 begin their checkout for Arianespace’s next Ariane 5 mission
July 11, 2007 SPACEWAY™3 is delivered to the Spaceport for its August Ariane 5 launch
June 29, 2007 Maintaining the launch rate: A second Ariane 5 begins its integration at Europe's Spaceport
June 26, 2007 The Ariane 5 ECA arrives in French Guiana for Arianespace's upcoming heavy-lift mission
June 1, 2007 Initial build-up of the Ariane 5 GS is complete at Europe's Spaceport
May 31, 2007 Special report: Starsem's successful mission for Globalstar in photos
May 30, 2007 Arianespace's Starsem affiliate orbits four Globalstar satellites from Baikonur Cosmodrome
May 24, 2007 Arianespace maintains its 2007 mission pace: a new Ariane 5 takes shape at the Spaceport
May 4, 2007
>Another Ariane 5 success, with a new record performance to geostationary transfer orbit
>Final countdown resumes for Arianespace's dual-payload mission
May 3, 2007
>Weather conditions delay the Ariane 5's launch for 24 hours
>Ariane 5 mission with ASTRA 1L and Galaxy 17: The final countdown has begun
May 2, 2007 Ariane 5 is transferred to the launch zone for its May 3 heavy-lift mission
May 1, 2007 The go-ahead is given for Arianespace's second Ariane 5 flight of 2007
April 24, 2007 The Galaxy 17 and ASTRA 1L payloads are installed on Ariane 5
April 20, 2007 ASTRA 1L is integrated on Ariane 5's dual-payload dispenser system
April 17, 2007 Galaxy 17 is "topped off" in the Spaceport's S5 payload preparation building
April 10, 2007 Ariane 5 is transferred to the Final Assembly Building
April 9, 2007 SES ASTRA's ASTRA 1L satellite is fueled for Arianespace's upcoming Ariane 5 mission
April 3, 2007 Intelsat's Galaxy 17 starts its pre-launch preparations at the Spaceport
March 29, 2007 The Spaceport welcomes ASTRA 1L for Ariane 5's upcoming launch
March 16, 2007 Ariane 5 receives its upper stage propulsion system and the equipment bay
March 14, 2007 A new Ariane 5 takes shape at the Spaceport for Arianespace's next launch
March 11, 2007
>Arianespace begins its 2007 mission activity with a successful dual-payload launch
>Countdown resumes for the Ariane 5 launch with Skynet 5A and INSAT 4B
March 10, 2007
>Ariane 5 launch: mission postponed
>Arianespace's first mission of 2007: final countdown underway
March 9, 2007 Ariane 5 rolls out to the launch pad for its dual-payload mission
March 8, 2007 The go-ahead is given for this weekend's Ariane 5 mission, while preparations begin for Arianespace's subsequent heavy-lift launch
March 7, 2007 Another Ariane 5 arrives at Europe's Spaceport
March 6, 2007 Ariane 5 is ready for launch with its Skynet 5A and INSAT 4B dual-satellite payload
March 5, 2007 INSAT 4B is installed on its Ariane 5 launcher
February 27, 2007 India's INSAT 4B is fueled for launch on Ariane 5
February 22, 2007 Ariane 5 is ready for its dual-satellite payload
February 14, 2007 Solar panel deployment for INSAT 4B is tested at the Spaceport
February 7, 2007 INSAT 4B "reaches out" at the Spaceport
February 1, 2007The second satellite for Ariane 5’s next mission is delivered to the Spaceport
January 23, 2007Skynet 5A is installed on the payload interface adapter for its upcoming Ariane 5 launch
January 11, 2007The Skynet 5A military communications satellite arrives for Arianespace's first Ariane 5 mission
in 2007
