Image library
>
Launch campaign

low-res | high-res (923 Kb)
Arabsat-5A’s encapsulation as the upper passenger
(Ariane 5 ECA/June 26, 2010)
|

low-res | high-res (1.90 Mb)
Ready for launch with Arabsat-5A and COMS
(Ariane 5 ECA/June 26, 2010)
|

low-res | high-res (1.12 Mb)
Transfer from the Launcher Assembly Building
(Ariane 5 ECA/June 2010)
|

low-res | high-res (4.48 Mb)
View from Final Assembly
Building
prior to rollout
(Ariane 5 ECA/Dec. 20, 2008)
|

low-res | high-res (5.12 Mb)
Close-up, ELA-3 Launch
Zone
during final countdown
(Ariane 5 ECA/Dec. 20, 2008)
|

low-res | high-res (2.60 Mb)
ELA-3 Launch Zone after
the
rollout of Ariane 5
(Ariane 5 ECA/Aug. 14, 2008)
|

low-res | high-res (1.98 Mb)
Launch table during Ariane 5’s
rollout to the Launch Zone
(Ariane 5 ECA/June 12, 2008)
|

low-res | high-res (1.98 Mb)
Ariane 5 leaves the Final
Assembly Building for ELA-3
(Ariane 5 ECA/June 12, 2008)
|

low-res | high-res (4.94 Mb)
Ariane 5 in the Final Assembly
Building
at the Spaceport
(Ariane 5 ECA/April 18, 2008)
|

low-res | high-res (5.12 Mb)
Final Assembly Building with
Ariane 5 on the launch table
(Ariane 5 ECA/April 18, 2008)
|

low-res | high-res (4.02 Mb)
Launch zone close-up, cryogenic
core stage and booster
(Ariane 5 ECA/Nov. 14, 2007)
|

low-res | high-res (3.85 Mb)
ELA-3 Launch Zone, ready
for
the final countdown
(Ariane 5 ECA/Nov. 14, 2007)
|

low-res | high-res (2.44 Mb)
Ariane 5 on its mobile launch
table in the ELA-3 launch zone
(Ariane 5 ECA/Nov. 14, 2007)
|
|
|