Mission Update-flight VS05

SOYUZ’ “CONNECTIVITY” mISSION TAKES SHAPE IN FRENCH GUIANA

Satellite integration and launcher build-up are now underway for the Arianespace orbiting of four O3b Networks spacecraft in June. more >

Mission Update-flight VA214

INITIAL BUILD-UP FOR ARIANE 5 MISSION IN JULY IS COMPLETED

Basic integration of the heavy-lift vehicle is finished at the Spaceport in preparation for its transfer to the Final Assembly Building.         more >

Mission Update-flight VA213

ATV ALBERT EINSTEIN IS NOW
INSTALLED ON ITS ARIANE 5

With the mating of Ariane 5’s heaviest payload ever, preparations are nearly complete for the June 5 Arianespace mission.              more >

About Arianespace | Launch services | Latest news | Press center | Careers | Contact us | Site map | RSS
Français | Terms and conditions of use | Online privacy statement | Twitter
© 2013 Arianespace